Saturday 22 October 2011

Still siding, Plumbing, Electrical and Ducting roughed in

As the title says the siding is still ongoing.  Takes a long time to put on cedar shingles.  Have to go through the house and patch all the holes from the completed rough in of plumbing, electrical and ducting and any other areas (e.g., breaks in sole plates) before the insulation can start.

Still missing the front door, garden door and balcony door.  They are supposed to be all here next week so it will then (finally) be weather and lock tight  (fingers crossed).