Drywall mudding is complete down stairs (except for a few spots around the stairs that got dry walled after stairs went in). Stairs (no railing yet) went in last Friday (forgot to post and take pictures).
Will add some pics (hopefully tonight). Kitchen cabinets may go in today (nope, not until next week).
A bunch of catch up photos (pretty random order as is a pain to move them around):
Key Features: 16in ~R50 truss walls; ~R100 roof; insulated slab on grade (R24 below R48 in front)in floor hydronic heat; small basement for mechanical and root cellar; attached passive solar greenhouse with 3ft thick rammed earth wall; Masonry heater; solar hot water; 10KW Bergy wind turbine (grid connected) hope will also run elec. vehicle; HRV; Composting toilet; High ER fiber glass windows; Permaculture to follow. See May 16 for history, explanation of design principles and plan pictures.