Saturday, 25 February 2012

Getting Close?

I guess it has been over a month and a half since I posted last.  Really falling off this blog thing.  Didn't think there was much to report as into trim and going slow but I guess there are a few things.  In our defense we took a couple of weeks (more like 10 days) off to visit Kathie and John in Curacao so it is
all their fault. Hopefully we will start moving in in 2-3 weeks.

Brent on beach in Curacao (actually on the beach in St. Marrten on the way home)  +34 degrees Celcius.  You could build an Eco house in this climate much easier (makes you wonder).

Brent the day after getting back from Curacao.  -20 degrees Celcius and big snow dump.  John, you may want to rethink (as nice as it was) the " I'm Coming Home Michael Buble" cover.


South doors from outside.  Still need to add the glass railing on the balcony.

South view with wind turbine

Kitchen and stairs
Stairs

South upper door from inside
Composting toilet 

Left to Right - 300DCS Lifebreath HRV, 20KW SlantFin electric boiler and Hot Water tank


Lights up


Door to Master bedroom, casing trim and baseboard

South french doors with baseboards complete

Closed under stair

Down stars bathroom

Downstairs bathroom shower

Down stairs bathroom with composting toilet seat

Kitchen cabinets


Floor grill.  Ran out of tile so a bit left to do on the upstairs landing

Upstairs bathroom


Upstairs bathroom tub shower

Amanda's room (a few drywall screw pops to fix and repaint)