Wednesday, 18 May 2011

Hauled basement floor trusses up to lot (had stored in old milk barn as had them built last fall in anticipation of starting construction).  Ordered and placed drain rock around basement drain.  Covered over with filter fabric and secured with rocks.  Hauled dirt back into basement :-( to bring root cellar up to desired grade.  Put down a layer of the drain rock as well.  Left enough dirt and stone to finish root cellar after basement poured.  Hard physical work.  Overworked back again and it is tender.  Will add some more pictures tonight.